The West Midlands Fire and Rescue Authority’s new regional Headquarters and ‘Safe-side Centre’ is located close to the centre of Birmingham and is built on approximately 1.75 hectares of a former Co-operative Dairy site. The Centre houses 7,100m2 of office space plus a dedicated educational safety centre that includes a replica life size town known as ‘Safe-side’, fully equipped with everyday ‘hazards’.Moore Environment was commissioned to design a biodiversity roof for the new centre. By incorporating this sustainable construction practice, the development met one of its key objectives, the achievement of an ‘Excellent’ BREEAM rating.The brief for the biodiversity roof combined two objectives: firstly, to design an interesting outdoor educational space for visitors and staff, and secondly to enhance local biodiversity. These objectives were achieved simultaneously by creating a visually interesting scene of sinuous inert textures and native plants, replicating typical brownfield land on the roof. Brownfield land often provides a rich and varied habitat for invertebrates, insects and birds, such as the black redstart, a rare robin-sized bird that has adapted to living at the heart of industrial and urban centres, where the terrain of typical brownfield sites, with brick and concrete debris, resemble its natural mountainous habitat. The roof was also designed to meet long term management objectives.It is intended that a sustained community interest in the roof will continue to be developed via links with local schools and conservation trusts. Moore Environment was instrumental in creating some of these partnerships and continues to take an active interest. Completion of the biodiversity roof demonstrates how a comparatively small site can successfully contribute to environmental enhancement within an urban area.The photo shows the roof 18 months after seeding. Log piles and small mounds improve micro-climate and add minor habitat variations for invertebrate and insects. It is intended the more open, rocky areas will attract the black redstart.

Overview

Location

Location 

Birmingham

Category

Individual buildings

Landscape Architect

Moore Environment

Client

West Midlands Fire and Rescue Authority

Brief

To provide an outdoor educational space for visitors and staff to the HQ and Safe-side Centre, to extend local biodiversity and replicate typical Black Redstart habitat

Awards

Birmingham

Details

Project Team

Project Manager: Fusion Building Consultancy. Landscape Architect: Moore Environment Research Ecologist: Dept Earth Science, University of Birmingham Structural Engineer: HSP

Local planning authority or government body

Birmingham City Council

Year Completed

May 2008

Project Size

300m2

Technical's

Planting

Two dry meadow wildflower seed mixtures were applied at 2 grams per m2 with some areas deliberately left clear for colonisation by local species. Both mixes contain Sedum acre (Biting stonecrop), a drought tolerant plant with high nectar reserves making it valuable to insects. Seed Mixture 1 was designed to be biodiversity focused and Included: Agriomonia eupatoria (Agrimony), Agrostemma githago (Corn cockle), Anthyllis vulneraria (Kidney vetch), Centaurea cyanus (Cornflower), C. nigra (Common knapweed), Daucus carota (wild carrot) and Silene vulgaris (Bladder campion). Seed Mixture 2 included some more ‘ornamental’ flower and grass species, these included: Achillea millefolium (Yarrow), Briza media (Quaking grass) Campanula rotundifolia (Blue harebell) Festuca rubra (Red Fescue), and Verbascum nigrun (Dark mullein). Moore Environment developed the appropriate seed mixes for the roof in collaboration with research ecologists from the University of Birmingham. The Department of Earth Sciences has developed an expertise in the ecological benefits of the establishment of biodiversity roofs.

Materials

To create suitable conditions, the biodiversity roof was installed using layers of material, mostly demolition waste such as crushed brick and concrete dusted with a sandy loam to create a suitable growing medium. This was laid in depths ranging from 75-150 mm for diversity of habitat and to add visual interest. Such substrate is often alkaline due to the high cement and mortar content, thus reducing completion from invasive species. To comply with fire regulations, an inert perimeter strip (500mm wide) was surfaced with pebble-mixture and left clear of seed and compost.Engineering advice ensured the structural integrity of the roof. A Bauder Systems drainage mat, capping sheet, under-layer, insulation board and root barrier were installed ahead of the substrate.

Contractors 

Main Contractor: Ashford PLC Landscape Contractor: BlakedownRoofing Contractor: Advanced Roofing

Moore Environment

Approximate Map Location


Location

Birmingham

Share

Other case studies you may like

Quarry Garden in Shanghai Chenshan Botanical Garden

Located at the core of Shanghai Chenshan Botanical Garden, Chenshan Hill is a rare scenic

Gunnersbury Park ‘Parks for People’ Project

Gunnersbury Park ‘Parks for People’ Project is the product of five years of extraordinary teamwork

London Borough of Barking and Dagenham Parks and Open Spaces Strategy and Corporate Natural Capital Accounts

Barking and Dagenham is one of London’s principal housing growth areas. The borough is already