Valentine’s Park

LUC

The overall intent was to reverse ingrained decline which threatened to significantly reduce both the historic value of the park, and its social and recreational use. More specifically it meant addressing considerable problems of social exclusion caused by crime, perceived lack of safety, and access difficulties; and harnessing and widening latent local interest.

Issues related to the decaying resource required urgent attention to prevent irreversible decline of buildings and garden structures that included Grade II* and Grade II grottos, a large formal canal, dovecot, an exquisite ‘alcove seat’ and extensive walled gardens of considerable historic significance.Other serious detractions included polluted water courses, dangerous structures / areas closed on safety grounds, and defunct facilities. Combined these placed the park close to the tipping point of becoming a ‘no-go’ area.

Overview

Location

Location 

Ilford, Essex

Category

Heritage

Landscape Architect

LUC

Client

London Borough of Redbridge

Brief

To secure the long-term future of the park, to increase access and social inclusion, to conserve listed buildings and garden structures (many on the Buildings at Risk Register) and to provide and integrate new facilities within the historic context.

Awards

Ilford, Essex

Details

Project Team

Lead Designers: Land Use ConsultantsSub-Consultants: Richard Griffi ths Architects; Heritage Cost Consultants; Peter Brett Associates

Local planning authority or government body

London Borough of Redbridge

Year Completed

November 2008

Project Size

50 ha

Technical's

Planting

Materials

– Use of archaeology trial trenching to inform restoration / design. – Restoration techniques of grottos using specialist materials / techniques such as glasswork, shell and flint. – Restoration of 120m long brick lined formal canal. Included special construction methodology for dewatering, removal of contaminated sediment, waterproofing using natural materials (clay) and localised replacement of 10,000 bricks without collapse of fragile structures. – Brickwork is constructed without mortar joints with sides raked. This allows for thermal movement. – Installation of water supply switching system to use high and low flows from surface water runoff from local roads to feed water features; cut off sewers; circulation pumps to restore cascades. – SUDs for car park runoff. – Bishops Walk mosaic: the commission of a 3m diameter floor mosaic from a specialist craftsman. The dramatic design depicts aspects of the parks history, working in tandem with other interpretation material.

Contractors 

LUC

Approximate Map Location


Location

Ilford, Essex

Share

Other case studies you may like

Quarry Garden in Shanghai Chenshan Botanical Garden

Located at the core of Shanghai Chenshan Botanical Garden, Chenshan Hill is a rare scenic

Gunnersbury Park ‘Parks for People’ Project

Gunnersbury Park ‘Parks for People’ Project is the product of five years of extraordinary teamwork

London Borough of Barking and Dagenham Parks and Open Spaces Strategy and Corporate Natural Capital Accounts

Barking and Dagenham is one of London’s principal housing growth areas. The borough is already