Millennium Town Park, St. Helier

Burns + Nice Limited

A neighbourhood containing the highest residential density in St. Helier, on the Island of Jersey, was suffering from a lack of open space. A 1.3 hectare site was identified as having potential to provide a new area of public open space; an idea conceived as early as 1996. A petition in 1997 gathered over 16,400 signatures supporting the idea. The challenge was how to create a water sensitive and sustainable design for a new park that balances environmental, technical and financial challenges.

Involvement of, and endorsement from, the public and the use of a multi-disciplinary project team were seen as being vital components of the project. In response to the Localism agenda, public consultation was to continue throughout the life of the scheme to result in a place which the community could feel to be their own.

The park was seen as an opportunity to bring immediate benefits to an area deprived of open space and demographically one of the poorest parts of Jersey. The transformation of the contaminated site into a park with trees and lawns could create a place for recreation and enjoyment and act as a catalyst for the regeneration of the surrounding area. A proposed scheme emerged after a robust site appraisal, establishing the relationship between the future park and the wider urban context.

Until 1991, the site was occupied by gas works and had since been used as a car park with any contamination sealed beneath tarmacadam surfacing. Development of the site required overcoming considerable problems associated with heavy contamination present in the ground. Jersey has no facility to treat contaminated material, so key features of the remediation were the re-use of existing site material and keeping spoil and wastage to a minimum for the scheme to become “Zero Waste”.

Two interactive water features placed at either end of the park – a water curtain and a water jet field provide visual interest and a community focus. All the water used for these features is being recycled at the central pump room and recirculated.

The remediation design provided a soil capping layer throughout the park. This capping layer is of varying depths to reflect the different planting depths required for the 150 new trees, the 10,000 new shrubs, and the lawns and dedicated biodiversity area provided at the eastern end of the site.

The capping layer consists of local soils and a drainage layer and below that an impermeable geosynthetic clay liner. The liner creates an impermeable barrier that prevents the mixing of capping material and the residual contaminated soil underneath. It also prevents the mixing of clean rain water and the contaminated ground below. The drainage layer above the impermeable barrier incorporates a bespoke drainage system that harvests the rainwater and channels it to an underground storage tank or alternatively discharges it to the public sewer system.

This 500,000 litre underground storage tank was constructed within the relined former tar well of the gas works. The stored water provides irrigation for the park via the site’s 5,400m of underground pipe work and over 6,000m of drip irrigation tube, watering grassed areas, trees and shrubs during the dry summer months.

It is hard to quantify and measure the ‘social returns’ of any scheme, but it is evident how this part of St. Helier has benefited immensely from a park which has rapidly become a focal point for celebrations and community events; the interactive water features are a draw for children and there are many using the park on a daily basis for relaxation. Its green and blue infrastructure has added considerable value to the local environment and biodiversity and therefore creates a valuable asset for all.

The case study demonstrates how a landscape-led multidisciplinary scheme can integrate land remediation, with sustainable construction techniques using Water Sensitive Urban Design principles to deliver a multi-functional landscape providing community benefit.

Overview

Location

Location 

St. Helier, Jersey

Category

Parks and gardens

Landscape Architect

Burns + Nice Limited

Client

The States of Jersey

Brief

As part of the masterplan for St. Helier North, Burns + Nice were commissioned to reinvent a contaminated former gas works site as a new public park, bringing immediate benefit to a neighbourhood deprived of open space and demographically one of the poorest on Jersey.

Awards

St. Helier, Jersey

Details

Project Team

Landscape Architect: Burns + Nice | Engineer: Parsons Brinckerhoff | Quantity Surveyor: Davis Langdon LLP

Local planning authority or government body

States of Jersey & Parish of St. Helier

Year Completed

2011

Project Size

Technical's

Planting

119 new trees planted within the park and its surrounding streetscapes emphasising the primary structure of the park and offering a diverse spatial experience, including lines of trees guiding the pathways, a bosque of birch trees and single specimen trees. Sways of shrub and groundcover planting break up and soften the formality of the primary geometry of the park layout. The planting is designed to support biodiversity throughout the park. The eastern edge of the park offers a dedicated biodiversity area where a large number of planted species support the native flora and fauna.

Materials

Granite paving and street furniture for the main spaces within the park and for the streetscapes surrounding the park. Resin bound gravel pathways. Mirror polished stainless steel for Water Curtain water feature.

Contractors 

VHE Construction Ltd.

Burns + Nice Limited

Approximate Map Location


Location

St. Helier, Jersey

Share

Other case studies you may like

Quarry Garden in Shanghai Chenshan Botanical Garden

Located at the core of Shanghai Chenshan Botanical Garden, Chenshan Hill is a rare scenic

Gunnersbury Park ‘Parks for People’ Project

Gunnersbury Park ‘Parks for People’ Project is the product of five years of extraordinary teamwork

London Borough of Barking and Dagenham Parks and Open Spaces Strategy and Corporate Natural Capital Accounts

Barking and Dagenham is one of London’s principal housing growth areas. The borough is already