Coughton Court Flood Alleviation

Bea Landscape Design Limited

Coughton Court is a Grade I listed National Trust property set within a Scheduled Ancient Monument and Conservation Area.  Bea Landscape Design Ltd was commissioned in 2008 as Project Manager, Quantity Surveyor and Landscape Architect for the flood alleviation proposals designed by hydrological consultants, Haycock Associates following the July 2007 flooding.  Bea Landscape Design Ltd was also appointed to carry out a tree survey and design and administer improvements to the main and overflow car parks.The flood alleviation scheme comprised the construction of a swale some 25m wide and 1m deep within the historic parkland to the front of the Court including the design and installation of a new vehicular bridge, the refurbishment of the historic metal estate gates and fencing and the extension of a limestone boundary wall.  The subsoil arisings were spread on adjacent fields and ploughed into the existing sward prior to seeding to create a wildflower meadow.Located in a historically sensitive landscape the project involved close liaison with the National Trust Archaeologist and County Archaeologist to achieve an acceptable design including a geophysical survey, trenching investigation and archaeological watching brief.

The car park improvements were successfully completed in 2009 and the flood alleviation proposals were completed in 2011.

Overview

Location

Location 

Alcester, Warwickshire

Category

Heritage

Landscape Architect

Bea Landscape Design Limited

Client

The National Trust

Brief

To project manage and provide detailed design drawings and specifications for planning approval, listed building consent, scheduled monument consent and construction in liaison with the structural engineers including the swale and associated bridge, historic stone wall extension, fencing refurbishment and design and administration of improvements to the main and overflow car parks.

Awards

Alcester, Warwickshire

Details

Project Team

Hydrologists – Haycocks Project Manager – Bea Landscape Design Quantity Surveyor – Bea Landscape Design Structural Engineers – Frank Haywood Associates CDM Co-ordinator – BCA Project Services

Local planning authority or government body

Stratford-on-Avon District Council

Year Completed

2010

Project Size

Technical's

Planting

Materials

Bridge and abutments faced with handmade bricks bedded and jointed with lime mortar.

Contractors 

Main Contractor: O’Briens Ltd Stone Mason: R N Fear & Sons

Bea Landscape Design Limited

Approximate Map Location


Location

Alcester, Warwickshire

Share

Other case studies you may like

Quarry Garden in Shanghai Chenshan Botanical Garden

Located at the core of Shanghai Chenshan Botanical Garden, Chenshan Hill is a rare scenic

Gunnersbury Park ‘Parks for People’ Project

Gunnersbury Park ‘Parks for People’ Project is the product of five years of extraordinary teamwork

London Borough of Barking and Dagenham Parks and Open Spaces Strategy and Corporate Natural Capital Accounts

Barking and Dagenham is one of London’s principal housing growth areas. The borough is already