Ashford ring road

Whitelaw Turkington

Ashford’s one-way ring road had become a ‘race track’ and a restricting collar to the town centre, strangling the life out of the town. The aspiration was to convert the ring road into a series of two-way quality streets and to ‘break up’ the whole ring road concept. 

An enlightened client allowed the landscape architect to develop the design of a unique and distinctive public realm. It was important to look at precedents and the work of the Dutch engineer Hans Monderman was introduced. The result is one of the first integrated pedestrian and vehicular routes in the UK. 

The brief led to the exploration of ways to achieve this by pushing the boundaries of conventional highway design. There was a need to start with ‘place making’ rather than filling in the bits left over after the highway had been designed.

Overview

Location

Location 

Ashford, Kent

Category

Transport

Landscape Architect

Whitelaw Turkington

Client

Brief

Converting a ring road into a series of two-way quality streets, introducing the concept of integrated streets and shared surfaces, and unlocking the stranglehold of the ring road.

Awards

Ashford, Kent

Details

Project Team

Landscape Architect: Whitelaw Turkington (now Grontmij)
Engineer and QS: Jacobs
Artists: John Atkin, Nayan Kulkarni, Simeon Nelson
Public Art Consultant: RKL

Local planning authority or government body

Kent County Council

Year Completed

2008-11-01 00:00:00

Project Size

1 km of road average width 15m

Technical's

Planting

Materials

The project itself has pushed the boundaries of conventional highway design with the integration of Public Art, Sustainable Urban Drainage and a place making approach to road design. The mantra of ‘art, engineering and environment’ has been central to Whitelaw Turkington’s approach to the design of the space. The integrated and interdisciplinary design team included three artists and an innovative, integrated rainwater management system that collects, cleanses, stores and recycles rainwater run-off. These ‘Rain Gardens’ have been adopted and is already being used as a precedent for other Local Authorites. They are setting new standards and act as a precedent for water conservation and management for future development both in Ashford and elsewhere.

Contractors 

Whitelaw Turkington

Map coordinates not available (invalid format).

Location

Ashford, Kent

Share

Other case studies you may like

Quarry Garden in Shanghai Chenshan Botanical Garden

Located at the core of Shanghai Chenshan Botanical Garden, Chenshan Hill is a rare scenic

Gunnersbury Park ‘Parks for People’ Project

Gunnersbury Park ‘Parks for People’ Project is the product of five years of extraordinary teamwork

London Borough of Barking and Dagenham Parks and Open Spaces Strategy and Corporate Natural Capital Accounts

Barking and Dagenham is one of London’s principal housing growth areas. The borough is already