A465 Heads of the Valley dualling: Section 1 Abergavenny to Gilwern – Bat mitigation plan

TACP

The project relates to the environmental management of a 6km long on-line highway improvement of Section 1 of the A465 Heads of the Valleys road in South Wales, within the Brecon Beacons National Park.

It affects two Special Areas of Conservation (SAC’s) designated under the European Union Natura 2000 programme. One is the Usk Bat Sites SAC which contains 5% of the Lesser Horseshoe Bat population of the UK.Following an Appropriate Assessment, the Countryside Council for Wales (CCW) were concerned that the integrity of the SAC would be affected. Construction works only commenced by Ministerial approval through the signing of an Imperative Reason of Overriding Public Interest (IROPI).The TACP team developed a bat monitoring plan to collect sufficient data to ensure that CCW was convinced that the integrity of the SAC was not compromised by the construction works and that bat numbers were maintained.

Overview

Location

Location 

Wales

Category

Transport

Landscape Architect

TACP

Client

Transport and Strategic Regeneration Welsh Assembly Government

Brief

To develop, implement and monitor the preformance of a Bat Mitigation Plan to allow a strategic highway project with 22 million vehicle movements to proceed in a Special Area of Conservation subject to the highest European Union environmental legislation.

Awards

Wales

Details

Project Team

Environmental Consultants, Landscape architects and Managers: TCAP | Engineer: Gifford

Local planning authority or government body

Year Completed

March 2009

Project Size

6 km

Technical's

Planting

Schedule feathered trees: height 200-250cm: Alnus glutinosa; Fraxinus excelsior; Quercus robur. Temporary screening trees: Populus nigra ‘Italica’; Salix fragilis planted at 1/sq.m for instant cover. Populus nigra and Salix fragilis will help create height and mass early on. These will require removal to create the final desired mix. Large feathered trees have been planted to create a ‘wedge’ of vegetation to guide bats over the road.

Materials

Use of cargo netting to aid echo locationto form anoverbridge. A concrete underpass was also builtwith new planting to divert bat populations away from the road.

Contractors 

BAM Nuttall

TACP

Approximate Map Location


Location

Wales

Share

Other case studies you may like

Quarry Garden in Shanghai Chenshan Botanical Garden

Located at the core of Shanghai Chenshan Botanical Garden, Chenshan Hill is a rare scenic

Gunnersbury Park ‘Parks for People’ Project

Gunnersbury Park ‘Parks for People’ Project is the product of five years of extraordinary teamwork

London Borough of Barking and Dagenham Parks and Open Spaces Strategy and Corporate Natural Capital Accounts

Barking and Dagenham is one of London’s principal housing growth areas. The borough is already